Work / Case Study
Foxconn Wisconsin Facility Opening
Cross-Border AV System Integration
Key integration vendor for the facility opening event; responsible for cross-border logistics and on-site execution; attended by the U.S. President
作品集 / 案例
Foxconn 威斯康辛廠開幕活動
跨國 AV 系統整合
擔任開幕活動的關鍵整合廠商,負責跨國物流與現場執行;美國總統出席
Overview總覽
TSIDC was the key integration vendor for the Foxconn Wisconsin facility opening, an event attended by the U.S. President. Ran the integration work as project manager: technical scoping, equipment selection, integration planning, cross-border shipping, on-site installation and testing, spares, and risk response.
The TSIDC role covered a ~10-engineer team and enterprise AV integration projects in the TWD 2M-10M range: video walls, OTT playback, matrix switching, and networked broadcast infrastructure for commercial and public-sector clients.
TSIDC 擔任 Foxconn 威斯康辛廠開幕活動的關鍵整合廠商,美國總統出席。作為專案經理,負責整合工作的端到端執行:技術規劃、設備選型、系統整合規劃、跨國運送、現場施工與測試、備品處理、風險應對。
在 TSIDC 期間帶領約 10 名工程師,交付 TWD 200 萬至 1,000 萬的企業 AV 系統整合案(電視牆、OTT 播放系統、矩陣切換、網路化廣播基礎設施),服務商業與公部門客戶。
Challenge挑戰
The date could not move and the event ran live, with the U.S. President in attendance. Equipment had to cross borders, get installed, integrated, and tested on site, and work on the day. Any risk had to be dealt with beforehand.
活動日期不可協調,美國總統出席,現場為直播環境。設備跨國運送後,需在現場完成施工、整合與測試,並於活動當日正常運作;風險須在事前排除。
How the Program Was Run執行重點
- ScheduleShipping, installation, integration, and testing all sequenced backward from the fixed date
- Cross-border logisticsEquipment movement tracked as its own workstream
- Installation and testingEverything installed, integrated, and tested before event day
- SparesBackup equipment prepared and managed for critical systems
- Risk responseReal-time troubleshooting through the whole event
- 時程以不可協調的活動日反推,排定運送、施工、整合、測試
- 跨國物流設備跨國運送獨立列管追蹤
- 施工與測試現場施工、系統整合與測試於活動前完成
- 備品關鍵設備備品準備與管理
- 風險應對活動全程即時排障
My Contribution我的貢獻
- Technical scoping and equipment selection
- System integration planning
- Cross-border logistics
- On-site installation, testing, and spares
- Real-time troubleshooting during the event
- 技術規劃與設備選型
- 系統整合規劃
- 跨國物流管理
- 現場施工、測試與備品處理
- 活動全程即時排障與風險應對