Work / Case Study

Taiwan's First SMPTE ST 2110 IP Studio

DaAi TV IP Production System

Taiwan's first studio and production-control (副控) system built on the SMPTE ST 2110 IP standard

Role Broadcast Systems Project Manager (Panasonic Sales Taiwan); one of three PMs on this project Duration Jul 2022 - Oct 2023 (tenure) Domain Broadcast / IP Media Infrastructure Status Delivered, Taiwan's first ST 2110 production system

1st
ST 2110 production system in Taiwan
1 of 3
project managers on the flagship
2-4
concurrent projects managed
TWD 0.2-100M
project range

作品集 / 案例

大愛電視 ST 2110 IP 製播系統(台灣首例)

台灣第一套建於 SMPTE ST 2110 IP 標準的攝影棚與副控系統

角色 廣播系統專案經理(Panasonic Sales Taiwan),本案三位專案經理之一 時程 2022年7月 - 2023年10月(任職期間) 領域 廣播/IP 媒體基礎設施 狀態 已交付,台灣首套 ST 2110 製播系統

1st
台灣首套 ST 2110 製播系統
1 of 3
本案三位專案經理之一
2-4
個並行專案
TWD 0.2-100M
專案規模區間

Overview總覽

One of three project managers on the Tzu Chi DaAi TV IP production project: Taiwan's first studio and production-control (副控) system built on the SMPTE ST 2110 standard. ST 2110 moves video and audio as streams over an IP network, which means the studio hardware, the network, and the control software have to ship as one system. Most of the equipment was Panasonic, filled out with other vendors' gear. The team studied ST 2110 deployments in other countries and tested equipment before committing to it.

This was the flagship engagement of the Panasonic role. In parallel, managed 2-4 concurrent broadcast projects (TWD 200K-100M) for media and government clients (camera systems, switchers, studio integrations), with project-level P&L.

參與大愛電視 IP 製播專案的交付,為三位專案經理之一:台灣第一套建於 SMPTE ST 2110 IP 標準的攝影棚與副控系統。ST 2110 以 IP 網路傳輸影音串流,攝影棚硬體、網路架構與控制軟體須作為單一系統整合交付。系統以 Panasonic 設備為主,整合其他廠牌設備構成完整系統;建置過程參考其他國家的 ST 2110 案例,設備經測試驗證後導入。

本案為 Panasonic 任職期間的旗艦案;同期管理 2 至 4 個並行的企業廣播系統專案(TWD 20 萬至 1 億),涵蓋攝影機系統、切換台與攝影棚整合,客戶為媒體與政府單位,並負責專案層級損益。

Challenge挑戰

Nobody had built an ST 2110 system in Taiwan, so there was no local reference to check against. The hardware, network, and software layers depend on each other, so specs have to line up across all three. The usual constraints applied on top: cost, schedule, multiple vendors.

台灣無 ST 2110 建置前例,無本地參考系統。硬體、網路、軟體三層相互依賴,規格須跨層對齊;專案同時受成本、時程與多廠商交付條件約束。

How the Program Was Run執行重點

  • Equipment selection and testingMostly Panasonic, integrated with other vendors' equipment; overseas ST 2110 builds used as references; gear tested before adoption
  • Risk responseRisk planning focused on the unproven parts of a first-in-market build
  • Vendor managementHardware, network, and software vendors and subcontractors coordinated in one place
  • Cross-border specsProduct specifications, feature alignment, and technical clarifications with Panasonic Japan HQ
  • P&LProject-level profitability, balancing technical requirements, solution design, and margin
  • IssuesCost pressure, delivery delays, and spec discrepancies handled through the delivery cycle
  • 技術選型與測試以 Panasonic 設備為主,整合其他廠牌設備;參考國外 ST 2110 建置案例,設備經測試驗證後導入
  • 風險應對針對首例架構的未驗證環節進行風險規劃與應對
  • 廠商管理硬體、網路、軟體多廠商與分包商統一協調
  • 跨國規格治理與 Panasonic 日本總部進行產品規格、功能對齊與技術釐清
  • 損益管理專案層級損益,平衡技術需求、方案設計與毛利限制
  • 議題處理成本壓力、交期延誤與規格差異於交付週期內處理

My Contribution我的貢獻

  • Delivery of Taiwan's first ST 2110 production system, as one of three project managers
  • Equipment selection and testing, with overseas builds as references
  • Risk planning and response for a first-in-market architecture
  • Vendor and subcontractor coordination
  • Spec alignment and technical clarification with Panasonic Japan HQ
  • Project-level profitability
  • 台灣首套 ST 2110 製播系統的專案交付,三位專案經理之一
  • 設備選型與測試:參考國外案例,測試驗證後導入
  • 首例架構的風險規劃與應對
  • 多廠商與分包商協調
  • 與 Panasonic 日本總部的規格對齊與技術釐清
  • 專案層級損益管理